At Hong Kong International Airport, two truck-mounted loader cranes worked side by side to lift an outsize project module out of an Antonov Airlines An-124 freighter. One of the two was a COPMA 7500, among the largest cranes in the COPMA knuckle boom range. It is a textbook tandem lift: two cranes sharing a single load that neither could place on its own in the space available.
A tandem lift looks simple from a distance and is anything but. This guide walks through how to plan and perform one with a COPMA 7500, using the Hong Kong job as the worked example.
In a tandem lift (also called a dual lift) two cranes take one load between them. You reach for it when a single machine cannot do the job for one of three reasons: the load is heavier than one crane's rating at the radius you have to work at; it is too long or too awkward to balance on a single hook; or the set-down point is somewhere one crane cannot reach cleanly. Splitting the load between two cranes gives you both the capacity and the control to lift it level and place it precisely.
The trade is complexity. The moment two cranes share a load, every movement of one changes what the other carries, so the whole operation has to be planned and run as a single coordinated lift, not two cranes working near each other.
The plan is where a tandem lift is won. Work through it in order:
A tandem lift asks two things of each crane: enough capacity to carry its share at the radius, and fine enough control to stay matched to its partner. The COPMA 7500 brings both.
Handled this way, a tandem lift turns a load that no single machine could place into a controlled, repeatable operation. The COPMA 7500 is built for exactly this kind of heavy, awkward, high-value work. Explore the COPMA 7500 and the wider range on the CPS Group website.